Test time

A digital block contains 10,000 flip-flops converted into 10 parallel scan chains of equal length. The Automatic Test Pattern Generation (ATPG) tool generates 500 test patterns. If the scan shift clock runs at 50 MHz, what is the exact time required to completely load and capture all test patterns (ignoring test setup overhead)?